New House Build Malaysia — From Empty Ground to Dream Home

BSC Construction Sdn Bhd delivers complete ground-up new house construction across the Klang Valley and Selangor. One CIDB-registered team handles architectural design, structural engineering, PBT council approvals, construction, and CCC handover.

Custom residential new house build and bungalow construction in Kuala Lumpur by BSC Construction Turnkey A–Z Build
Build Benchmark
RM150–400+/sqft
Typical Duration
12 – 24 Months
Approvals
PBT Plans + CCC
Accreditation
CIDB G4
Why Build New

Build Your Dream Home From the Ground Up in KL & Selangor

A new house build lets you construct a custom residence from scratch on empty land or a prime rebuild plot — giving you total control over spatial layout, natural ventilation, structural grade, and material finishes.

Instead of juggling separate architects, civil engineers, council runners, and contractors, BSC Construction manages every discipline under one accountable CIDB-registered roof — combining local building expertise with transparent milestone billing.

Full Design Control

Tailored layouts, facades & material specs.

Single Contractor A–Z

Design, PBT approvals, build & CCC in one contract.

CIDB Grade G4 (Up to RM 3M)

Active B04, CE21 & M15 · Reg. 0120220228-WP095872.

Built to Last

Tropical waterproofing & structural warranty.

Completed custom terrace and corner-lot house construction in Kuala Lumpur
Ground-Up · Custom Design · A–Z Klang Valley & Selangor
What We Build

Types of New House Builds We Deliver in Malaysia

From compact urban terrace rebuilds to custom double-storey bungalows and commercial shoplots — engineered for your land plot and budget.

01 / CUSTOM BUNGALOW

Bungalow & Detached Houses

Custom-designed 1-storey or 2-storey bungalows built on your land with complete architectural freedom — layout, facade, MEP, finishes, and landscaping.

02 / SEMI-D

Semi-Detached Houses

Build a semi-D from scratch on generous Klang Valley plots — shared party-wall engineering with your own bespoke architectural design.

03 / TERRACE

Terrace Houses

Modern Malaysian terrace homes optimised for daylight, cross-ventilation, structural longevity, and clean contemporary facades.

04 / REBUILD

Demolish & Rebuild

Tear down an ageing structure and construct a brand-new home on the same prime land plot — ideal when land value exceeds the existing building.

05 / TURNKEY

Design-and-Build (A–Z)

No architectural plans yet? We handle concept design, 3D renders, structural engineering, PBT council submissions, construction, and CCC under one roof.

06 / COMMERCIAL

Commercial & Shoplot Builds

Ground-up construction for shoplots, boutique offices, and mixed-use buildings including RC structure, full MEP installation, and interior fit-out.

Real Design & Build Proof

Ulu Yam — New 2-Storey Bungalow Delivered in 5 Months

For the Ulu Yam bungalow project in Selangor, BSC Construction demolished the old structure and built a new double-storey bungalow for RM 600K+ in just 5 months — vs. the architect's 12-month estimate.

  • SCOPEDesign & Build A–Z
  • TIMELINE5 Mos (Est. 12 Mos)
  • BUDGETRM 600K+
  • LOCATIONUlu Yam, Selangor

Completed Bungalow Walkthrough · Ulu Yam, Selangor

Our Build Process

How We Build a New House — From Design to CCC Handover

Every ground-up project follows six transparent stages with milestone inspections and clear progress reporting.

Start Phase 01 →
  1. 01

    Consultation & Site Assessment

    We inspect your land in KL or Selangor, evaluate soil conditions and access, and align on your spatial brief, budget, and target timeline.

  2. 02

    Architectural Design & Engineering

    Architectural floor plans, 3D visualisations, structural engineering drawings, and MEP layouts prepared before a single brick is laid.

  3. 03

    PBT Council Approvals & Permits

    We handle local council (DBKL, MBPJ, MBSA, MBSJ, etc.) building plan submissions, development orders, and statutory compliance.

  4. 04

    Foundation & Structural Works

    Site clearing, earthworks, soil treatment, piling (where required), foundation pouring, and reinforced concrete columns, beams, and slabs.

  5. 05

    Roofing, MEP & Wet Works

    Roofing system installation, mechanical/electrical/plumbing rough-ins, bricklaying, plastering, waterproofing, screeding, and tiling.

  6. 06

    Finishing, Inspection & CCC Handover

    Painting, cabinetry, doors/windows, external landscaping, joint defect inspection, Certificate of Completion and Compliance (CCC), and key handover.

Full Scope A–Z

Complete New House Build Scope — Everything Under One Roof

Stage A · Pre-Construction

  • Architectural design & 3D visualisation
  • Structural & civil engineering drawings
  • PBT council plan submissions & approvals
  • Site clearing, earthworks & soil treatment
  • Piling & reinforced foundation works

Stage B · Structure & Wet Works

  • RC structure — columns, beams & slabs
  • Bricklaying, masonry & block walls
  • Metal deck, concrete or clay tile roofing
  • Plumbing, electrical & air-cond rough-ins
  • Plastering, rendering & skim coating

Stage C · Finishes & Handover

  • Tiling, waterproofing & wet works
  • Interior & exterior weather-shield painting
  • Cabinetry, doors, windows & fixtures
  • Boundary walls, auto gate & landscaping
  • Quality inspection & CCC certification
2026 Cost Guide

How Much Does It Cost to Build a New House in Malaysia?

New house construction in Malaysia typically costs RM150 to RM400+ per square foot depending on architectural complexity, soil conditions, and finishing grade.

Tier 01 · 1,200–2,000 sqft

Terrace House

RM250K – RM500K

Estimated timeline: 12 – 18 months

Standard double-storey terrace build including foundations, RC structure, roofing, MEP rough-ins, and complete interior finishing.

Request Terrace Quote
Most Popular

Tier 02 · 2,000–3,500 sqft

Semi-Detached

RM500K – RM900K

Estimated timeline: 14 – 20 months

Double or triple-storey semi-D with bespoke spatial layout, upgraded facade materials, full MEP, and custom finishes.

Request Semi-D Quote

Tier 03 · 3,000–6,000+ sqft

Custom Bungalow

RM800K – RM1.5M+

Estimated timeline: 18 – 24 months

Architect-designed bespoke bungalow with premium specifications, structural engineering, boundary walls, and full landscaping.

Request Bungalow Quote

*Estimates exclude land cost. Final quotation is itemised after free on-site inspection and design briefing.

New Build FAQ

Frequently Asked Questions About Building a New House in Malaysia

Key answers on build cost per square foot, timelines, PBT approvals, and demolish-and-rebuild projects in KL and Selangor.

Have Land Ready to Build?

Building a new house in Malaysia typically costs RM150 to RM400+ per square foot excluding land. Standard terrace builds range from RM250,000–RM500,000, semi-D builds from RM500,000–RM900,000, and custom bungalows from RM800,000 to RM1.5M+ depending on soil works and finish grade.

A complete new house build takes 12 to 24 months from architectural design and PBT council approval through structural construction, MEP, finishing, and CCC handover — roughly 12–18 months for a terrace house and 18–24 months for a custom bungalow.

Yes. Our design-and-build A–Z service handles architectural submissions, structural engineering sign-offs, local council (PBT) building plan approvals, and final Certificate of Completion and Compliance (CCC) certification.

Yes. We handle complete demolish-and-rebuild projects across Kuala Lumpur and Selangor — including safe demolition, debris clearing, soil assessment, new structural construction, and full turnkey handover.

Ready to Build Your Dream Home?

Whether you have empty land ready or plan to demolish and rebuild — book a free on-site consultation with our CIDB-registered design-and-build team.